Heat Rate Cost – Part 1Heat Rate Cost – Part 1Heat Rate Cost – Part 1Heat Rate Cost – Part 1
  • Home
  • Services
    • Services Overview
    • Technical Training
    • Plant Engineering
    • Technology Transfer
    • Short Course Catalog
  • Industries Served
    • Power Generation
    • District Energy
    • Transmission & Distribution
    • Pulp and Paper
    • Water and Wastewater Treatment
    • Beverage
    • Heavy Industry
  • Who We Are
    • Our Team
    • Experience
    • Careers
  • Blog
  • Contact us
✕
Inside the Matrix Part 2: Breaking the Code
September 13, 2021
Setting SMART Training Goals
October 11, 2021
Show all

Heat Rate Cost – Part 1

Published by James Wiggins at September 27, 2021

The control of unit efficiency in a power plant requires a team effort from operators, maintenance personnel, engineers, and the support of plant management. The focus on plant efficiency is generally on the heat energy that is supplied to the plant as compared to the electrical energy produced, measured using a parameter called heat rate.

Often power plant personnel have difficulty in understanding how somewhat abstract ideas like heat rate are related to competitiveness and job security.  The best way to understand the connection is to relate power plant heat rate to a dollar value based on fuel cost.  The following simple calculation shows the effect of an improvement of 100 BTU/kWH for a hypothetical unit.  The following parameters define the plant and the problem:

  • Base Unit Heat Rate – 9500 BTU/KWW
  • Improved Unit Heat Rate – 9400 BTU/kWH
  • Unit Rating – 600 MW
  • Fuel Cost – $2.00/MBTU (Typical Coal Cost)
  • Capacity Factor – 80%

The following equation is used to calculate the total fuel cost for the operation of the unit for one year:

Heat Cost Equation 1

Substituting the values for the example unit into this equation for the base heat rate of 9,500 BTU/kWH, the following results:

Heat Cost Equation 2

Substituting the values for the example unit into this equation for the improved heat rate of 9,400 BTU/kWH, the following results:

Heat Cost Equation 3

The savings due to the improvement in heat rate can be determined by calculating the difference between these two annual costs as shown below:

Heat Cost Equation 4

This calculation shows that a change in heat rate of 100 BTU/kWH for a unit with a 9,500 BTU/kWH (a little more than 1%) results in savings of almost $850,000! Power plant operators, maintenance personnel, engineers, and the support of the plant management should continuously strive to improve heat rate, and corresponding efficiency, for their units.

This blog is Part 1 of a three-part series. In the upcoming blog posts (Part 2 & 3), the following will be addressed:

  • Part 2: Impact of cycling on heat rate, as conventional power plants are expected to cycle more as renewables increase their penetration into the market.
  • Part 3: Ways to improve heat rate, including potential engineering, operations, and maintenance improvements at your facility.

Previously Generated Blogs:

Induced Draft Cooling Tower Cold Weather Operations

Supercritical CO2 and the Allam-Fetvedt Power Cycle

James Wiggins
James Wiggins
James Wiggins is a Vice President at FCS. After nearly a decade as a US Navy operator and mechanic, He shifted focus to providing operational readiness services and training to energy-producing plants and process facilities. With 15+ years of industry-related experience, he possesses a wealth of knowledge and is passionate about providing value to his customers.

Related posts

March 24, 2023

Much Ado About Poo: An Overview of Wastewater Treatment


Read more
October 31, 2022

MWh Generation Cost Factors


Read more
October 7, 2022

Fossil Fuel Prices Over Time


Read more

1 Comment

  1. Heat Rate Cost - Part 2: Impact of Increased Renewables says:
    November 29, 2021 at 9:32 am

    […] blog is Part 2 of a three-part series.  Part 1 covered the impact of fuel cost on heat rate.  This blog covers the impact of cycling on heat […]

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Blog Posts

  • 0
    Much Ado About Poo: An Overview of Wastewater Treatment
    March 24, 2023
  • 0
    Understanding VARs (without using math)
    March 10, 2023
  • 0
    NOX Reduction in Combustion Turbines
    February 17, 2023

Fossil Consulting Services, Inc.

6325 Woodside Court, Suite 222
Columbia, Maryland 21046
Telephone: (410) 312-6240
Email: FCS@FossilConsulting.com

NEW FCS Logo_White
© 2022 Fossil Consulting Services, Inc. All Rights Reserved.